Traffic control mainly consists of daylight flagging operations.
Two detours will be placed during the 2020 construction season.
The first detour will begin on Monday, June 1 for a pipe replacement.
THe 6.9 mile detour route will follow; Route 2031 (Garrett Shortcut Road) and Route 2047 (Berlin Plank Road). This detour will be in place no longer than 30 days.