Begin Main Content Area

Interstate 70 Yukon / Madison Interchanges

08/21/2018

Interstate 70 Yukon / Madison Interchanges
PennDOT to hold Plans Display
South Huntingdon, Sewickley and Hempfield Twps. and New Stanton Borough,
Westmoreland County

Uniontown, PA – The Pennsylvania Department of Transportation, in cooperation with the Federal Highway Administration, is currently performing final design for the reconstruction of 3.7 miles of Interstate 70. This project includes widening the median to a minimum of 10 feet, providing 12-foot outside shoulders, reconstructing the interchanges at Exits 53 and 54 by lengthening the ramp acceleration and deceleration lanes, and providing an eastbound and westbound auxiliary lane between the two interchanges. The project also includes replacement of four mainline Interstate 70 bridges, one mainline Interstate 70 buried culvert, a new proposed culvert at the eastbound on- and off-ramps for the Yukon Interchange and maintenance on one Route 3010 structure.

        Date:                   Thursday August 30, 2018
        Time:                  5:00 PM to 6:30 PM
        Location:          Yukon Fire Department
124 Highway Street
Yukon, PA 15698


The meeting location is accessible to persons having disabilities. Any person requiring special aid is asked to contact the Pennsylvania Department of Transportation prior to the meeting. If you require additional information concerning this meeting, please contact Mr. Jeremy Shaneyfelt, P.E., Project Manager, at 724.439.7321 prior to the Open House.
MEDIA CONTACT: Valerie Petersen, 724-439-7375