Project Overview

This Preservation project includes the Layton Bridge and Layton Tunnel located in Perry Township, Fayette County.  The proposed scope of work consists of repairing masonry elements at both portals of the tunnel, installing additional riser beams on the bridge floor system (spans 2-17) as needed, mitigating deficiencies to the bridge timber sidewalk (spans 4-17), repairing or replacing bridge joints as needed, and performing any miscellaneous concrete and/or steel repairs to the bridge deck, superstructure, and substructure as needed.  Work completed will be in accordance with the approved drawings included in the bid package for the 2022 Layton Bridge Preservation, Section 08M.  Limits of work are between segment 0100/2480 and segment 0110/2025. 

The purpose of this project is to allow the structure to continue to safely carry traffic for the immediate future, until a new structure is constructed as part of a larger, separate project

Construction is scheduled for the Summer of 2022.  

Project Pictures

P6240011.JPG

P6280005.JPG

P6290086.JPG

P6290089.JPG